
Scope:
Fabrication in New Zealand and containerised shipment to Queensland. Site works involving excavation to expose MLV-4, parent metal sampling, new RC slabs, in-service welding, assisting hot tap crews and interconnecting piping. Includes assistance with intelligent pigging of 32km of interconnecting pipeline.