Scope:
The installation of 4 kilometres of 600NB (24”) 11.4mm WT GRADE 450 Gas Pipeline, 550m of 250NB (10”) 9.3mm WT API 5L X52 Condensate Pipeline, associated Launcher and Receiver Piping, Tie Ins, Hydrotesting and Drying
8 kilometres of 600NB Gasline and 35kms of 250NB Condensate Line.