Location: Ahuroa Well Site to Stratford Power Station, Taranaki
Scope:
Construction of a 9 kilometre 450NB (18 inch) High Pressure Gas Pipeline from the Ahuroa Gas Storage Wellsite to the Stratford Power Station. The route included steep hill country, road reserve and 2 river crossings.